Project #:

N22-E010

Project Type:

Equipment Training and Support Services

Project Date:

2022-04-19


The Drill team in

Nigeria

have built their capacity with

2nd 40-foot container of pumps and parts with shipping cost

thanks to the generous support of

Nellie Ottevangers

(Brampton, ON)

A message from the community

Dear Donor:

It is with pleasure that I write this note of thanksgiving. Your support to bring us an entire 40-foot container filled with pumps and pump parts is like a miracle to all of our team and even more so to the villages that will have safe water because of your kindness and generosity.

Thank you so much.  We are petitioning our God to bless you all.

  -- Hosea Apeh, Program Coordinator


Some community details (provided by our in-country partners)

This 40-foot container held:

  • 220 complete pump assemblies
  • 100 various parts needed to repair Indian Mark II hand pumps
  • 450 various parts needed to repair Afridev hand pumps
  • All shipping and transportation costs incurred 



Unloading the truck

Unloading the truck

40 foot container load of Pumps and parts

40 foot container load of Pumps and parts

240 Pumps and parts

240 Pumps and parts

Loading up the trucks for repair and drilling work day

Loading up the trucks for repair and drilling work day



For just over $1 you can provide a child with safe water for a year!

HOME

OUR STORY

RESOURCES

GET INVOLVED

DONATE

CONTACT US
457 Heather Crescent
Thunder Bay, ON P7E 5L1
Canada
+1 807-622-4848
info@lifewater.ca



Facebook Logo    Camera Glyph Icon

Copyright © 2024. All rights reserved.