H16-R002
Pump Replacement Projects
2015-08-20
Latitude: 19.26312, Longitude: -72.68668
open map
Dear Sponsor In this community of 2000 people,it is very difficult when the pump is not working and we have to try and get water from the next nearest pump which already serves a lot of people. We are thankful that we can call Lifewater to come and repair it. All I can Say thank you Lifewater for fixing our well and giving us a new pump. We had problem to find good water and now that is all over. Thank you again God bless you. Hernes Joseph Well Caretaker
Water hardness - 40 ppm This project is the replacement of an existing pump that had to be completely removed. Population of this area directly around pump is about 1500 people. The closest dug water hole was about 200 meters away and made the people sick a lot of the time.
Well Depth: | 100 ft. | Turbidity: | Clear |
Depth of Water: | 3.00 ft. | Water Colour: | Clear |
Well Yield: | 3.00 gpm | Water Odour: | None |
Screen Length: | 10.00 ft. | Taste: | |
Casing Diameter: | 4.00 in. | Nitrate: | 0.000 mg/L |
Handpump: | Iron: | 0.000 mg/L | |
Developed By: | Electric Pump | pH: | 6.000 |
Development Time: | 3.00 hrs. | Bacti Test: | Negative |
Disinfection: | 24.00 hrs. |