H20-E013
Equipment Training and Support Services
2020-02-03
Dear Sir/Madame The driveway into the compound is very steep. With the heavy rains, it has been eroding badly giving us deep ruts and trouble getting the rigs and trucks up to the parking shed. The gravel all washes down the road and gets into the track for the gate, making it hard to open. It is a problem that is now solved because of your generosity. The cement work done by Enel and Job has made it easy to go up the lane even in the rain. They put ridges in the cement using a rake and this provides traction. We were able to do it all the way to the top of the hill so the gravel can't wash down to make the lane slippery. It is really great! Thank you so much Hanania Orelus Program Coordinator Association du Lifewater d'Haiti