H17-R001
Pump Replacement Projects
2016-07-27
Latitude: 19.63029, Longitude: -72.24802
open map
Dear Lifewater & Sponsor First I want to say thank you to the Lord first and also to Lifewater and all the supporters for the new pump they replaced for us. This major problem is resolved thank you very much. Aliette Floreus Well Caretaker
Water hardness - 40 ppm This project is the replacement of an existing pump that had to be completely removed. Population of this area directly around pump is about 3000 people. Prior to this pump replacement, we had to walk 1 kilometer to another pump.
Well Depth: | 40 ft. | Turbidity: | Clear |
Depth of Water: | 15.00 ft. | Water Colour: | Clear |
Well Yield: | Water Odour: | None | |
Screen Length: | 10.00 ft. | Taste: | |
Casing Diameter: | 4.00 in. | Nitrate: | 0.000 mg/L |
Handpump: | Afridev | Iron: | 0.000 mg/L |
Developed By: | Electric Pump | pH: | 7.000 |
Development Time: | Bacti Test: | Negative | |
Disinfection: | 24.00 hrs. |