K21-R017
Pump Replacement Projects
2020-12-19
Latitude: -0.30711, Longitude: 35.75852
open map
The school principal writes "The students, parents, teachers, and the Mianzini secondary school board of management would wish to register appreciation for the well protection and installation of hand pump at the school. The well will go a long way in ensuring sufficient water supply for the school.
Installation of new pad and pump
Well Depth: | 0 ft. | Turbidity: | |
Depth of Water: | 0.00 ft. | Water Colour: | |
Well Yield: | Water Odour: | ||
Screen Length: | 0.00 ft. | Taste: | |
Casing Diameter: | 0.00 in. | Nitrate: | |
Handpump: | Afridev | Iron: | |
Developed By: | pH: | ||
Development Time: | Bacti Test: | ||
Disinfection: |